Monting d.o.o.
Reconstruction of boiler WBK-1
The project covered the reconstruction of the WBK-1 high-pressure steam boiler with a capacity of 125 t/h, including dismantling, pre-assembly of segments, welding, non-destructive testing (NDT) and pressure testing. The work was carried out in confined conditions, with careful coordination of activities, safe handling of equipment and high standards of workmanship.
Project details
- Project name
- Reconstruction of boiler WBK-1
- Client
- Monting d.o.o.
- Location
- Osijek, Croatia
- Category
- Boilers
Projects
See our other projects
A selection of repair and installation projects carried out in Croatia and across Europe.